| 07DEC12 days left | Special repair to Quarter No.21 / I & J in residential colony at Kot Addu Railway station in the section of IOW/MZG P200937Works
| Pakistan Railways (Pakistan Railways) | Railways Works | 17 Nov 2026 7 days ago | Not stated | |
| 07DEC12 days left | SPECIAL REPAIR TO PIT INCLUDING REPLACEMENT OF RACE RAIL AND MS BEARNING PLATES OF 1X 60’ DIA TURN TABLE AT SHORKOT CANTT STATION ON KHANEWAL-SHORKOT CANTT SECTION P201177Works
| Pakistan Railways (Pakistan Railways) | Railways Works | 17 Nov 2026 8 days ago | Not stated | |
| 07DEC12 days left | UP-GRADATION OF CLASS-III (UN-MANNED) L-XING NO.196 AT KM NO.268/0-1 INTO CLASS-I ( 32' WIDE) MANNED L-XING BETWEEN KLO-PPL STATIONS ON SSH-KDA SECTION P196407Works
| Pakistan Railways (Pakistan Railways) | Railways Works | 12 Nov 2026 13 days ago | Not stated | |
| 07DEC12 days left | Replacement Of Damaged RCC Slab and Repair of Sub-Structure of 2x10' RCC Slab Bridge No.560 at Km.263/12-13 On KZLC-ADK Section P201207Works
| Pakistan Railways (Pakistan Railways) | Railways Works | 17 Nov 2026 8 days ago | Not stated | |
| 07DEC12 days left | RECONSTRUCTION OF WASHED AWAY WING WALL (KZLC END LEFT SIDE) AND REPAIR OF SUBSTRUCTURE OF 2X31'-3"(SKEW) GIRDER BRIDGE NO. 566 AT KM. NO. 265/12-13 BETWEEN FAZILPUR DHANDI – JAMPUR STATIONS ON KZLC-ADK SECTION P201252Works
| Pakistan Railways (Pakistan Railways) | Railways Works | 17 Nov 2026 8 days ago | Not stated | |
| 07DEC12 days left | OPERATIONALIZATION OF SHAEENABAD BALLAST QUARRY BY INSTALLING CRUSHER AND SUPPLYING, STACKING AND LOADING BALLAST 2000000 CFT PER YEAR/TERM 2 INCH (50MM) SIZE FROM SHAHEENABAD QUARRY NO.2 ON LONG TERM BASIS FOR TEN (10) YEARS/ TERM (20 LACS CFT PER P195912Goods
| Pakistan Railways (Pakistan Railways) | Railways Goods | 13 Nov 2026 12 days ago | Not stated | |