15 days leftGoodsRailways
Operationalization OF shaeenabad ballast quarry BY installing crusher AND supplying, stacking AND loading ballast 2000000 CFT PER year/term 2 INCH (50mm) SIZE FROM shaheenabad quarry NO.2 ON LONG TERM BASIS FOR TEN (10) years/ TERM (20 LACS CFT PER
Pakistan Railways (Pakistan Railways)
Goods