BidKar
11 days leftOpen to foreign firmsGoods supply

USCGC HICKORY (WLB-212) DRYDOCK REPAIR FY27

Country
Buyer
HOMELAND SECURITY, DEPARTMENT OF / US COAST GUARD
Closing
07 Dec 2026, 21:00 (Pakistan time)
Published
18 Nov 2026
Type of notice
Sources Sought
Category
Goods · NAICS 336611
Reference
70Z08527RIBCT270001087
Place of performance
HI
NAICS code
336611
Source
Who can bid

Not set aside: foreign firms may bid, but US trade rules (Buy American / Trade Agreements Act) can limit goods made in Pakistan - read the clauses first.

Summary from the notice

This is a SOURCES SOUGHT NOTICE / REQUEST FOR INFORMATION; not a pre-solicitation notice or solicitation for proposals/quotations. The applicable NAICS Code is 336611, Ship Building and Repairing, and the size standard is 1,300 employees. REQUIREMENT: This notice is issued by the U.S. Coast Guard, Surface Forces Logistics Center, and Alameda, CA to identify sources capable of providing the following: Contractor shall provide all necessary labor, materials, services, equipment, supplies, power, accessories, special tools and such other things as are necessary to perform DRYDOCK maintenance to the U.S. Coast Guard Cutter, USCGC HICKORY (WLB 212). USCGC HICKORY (WLR-WLB 212) DRYDOCK AVAILABILITY FY27. ANTICIPATED NAICS CODE/SIZE STANDARD: The applicable NAICS Code is 336611, Ship Building and Repairing and the size standard is 1,300 employees. GEOGRAPHICAL RESTRICTION: YES, SUBJECT TO U.S COAST GUARD DISTRICT 14 - HAWAII MILITARY CONSIDERATION MEMORANDUM PLACE OF PERFORMANCE: Contractor�s Facility DESCRIPTION OF WORK: This requirement is for the contractor to provide all necessary facilities, materials, equipment, personnel, and other such things necessary to perform Dry-dock repairs to the U.S. Coast Guard Cutter (USCGC) HICKORY (WLB 212). This vessel�s homeport is Coast Guard Station Apra Harbor Guam 96915. All work is to be performed at the Contractor�s facility. The required performance period is 84 days. The performance period is 15 July 2027 � 07 October 2027 to accommodate Coast Guard cutter operational needs. Description: This Dry Dock will consist of approximately one hundred and ten (110) work items, not limited to: hull plating ultrasonic testing, underwater body preserve, propeller removal and inspect, propulsion shaft remove, inspect and reinstall, rudders…

Open the original notice on SAM.gov

BidKar lists this notice to help you find it. Bids go to the buyer through the portal named above, never through BidKar. Check the original documents for the latest dates and conditions.