BidKar
22 days leftForeign bids at buyer's discretionOn-site in the US

Recreation Ground Pavilion Upgrade of Toilets, Showers and Hot Water System

Country
Buyer
Trawden Forest Parish Council
Closing
18 Dec 2026, 22:00 (Pakistan time)
Published
18 Nov 2026
Type of notice
Below threshold - open competition
Category
Works
Reference
ocds-h6vhtk-07be6b
Source
Who can bid

UK tender under the Procurement Act 2023. Pakistan is not a 'treaty state', so the buyer may disregard or exclude a Pakistani bid, but is not obliged to. Register free on Find a Tender and check the notice.

Summary from the notice

The successful contractor shall provide all labour, materials, plant, equipment, supervision, and waste disposal necessary to complete the works described below. Plumbing and Hot Water Systems • Remove and responsibly dispose of the existing hot water cylinder. • Supply and install a new energy-efficient hot water system suitable for the building's intended use and occupancy levels. • All plumbing works shall comply with current Building Regulations and Water Regulations. • Contractor to recommend and specify the most appropriate replacement system within their tender submission. Shower Facilities • Remove all existing shower installations. • Supply and install individual showers within separate shower cubicles. • Complete all associated plumbing, drainage and electrical works. • Ensure adequate ventilation is maintained or upgraded as required. Toilet Refurbishment • Remove all existing sanitaryware and associated fittings. • Supply and install new WC suites, wash hand basins, taps and accessories. • Layout shall follow the design and arrangement shown on the drawings supplied by the Council. • Include necessary alterations to drainage, water supply and waste connections. • All facilities must comply with current accessibility requirements where applicable. Entrance Area Alterations • Carefully demolish and remove internal partition walls within the entrance area as indicated on the drawings. • Create an open-plan social area. • Make good all affected surfaces including ceilings, walls and floors. • Undertake any necessary structural works identified during the contractor's investigations. • Contractor shall verify wall construction prior to commencement and provide any required structural calculations. Flooring Works • Remove existing floor finishes within all…

Open the original notice on Find a Tender

BidKar lists this notice to help you find it. Bids go to the buyer through the portal named above, never through BidKar. Check the original documents for the latest dates and conditions.