Ford Island Hawaii Roll Up Door
Not set aside, but the work is performed in the US - realistic only with a US partner or presence. Needs SAM.gov registration.
Summary from the notice
THIS IS NOT A SOLICITATION. THIS IS A REQUEST FOR INFORMATION ONLY. SEE ATTACHMENTS FOR FULL DETAILS. The anticipated project includes, but is not limited to: � Furnishing and installing a large roll-up door within an existing non-load-bearing concrete masonry unit (CMU) wall. � Demolition, cutting, removal, framing, finishing, and related work necessary to create the new door opening. � Relocation and/or modification of affected utilities, including electrical power, compressed air, and water lines. � Relocation of an existing air-conditioning unit and associated ductwork to accommodate installation and operation of new equipment. � Restoration of affected interior and exterior finishes. � Coordination of work in an operational facility and compliance with installation access, safety, environmental, and utility-outage requirements. See the attached questionnaire for full details available at this time.
BidKar lists this notice to help you find it. Bids go to the buyer through the portal named above, never through BidKar. Check the original documents for the latest dates and conditions.