Site Visit - Removal of Old Fluid Cell
Not set aside, but the work is performed in the US - realistic only with a US partner or presence. Needs SAM.gov registration.
Summary from the notice
The Contractor shall provide to the Maintenance Support Group (MXSG) all the tools, parts, materials, equipment, labor, and transportation necessary to decommission, remove, and dispose of one (1) Quintus ABB QFC 1.6 x 4-1400 fluid cell press. The equipment is located in building 140 at Robins Air Force Base (AFB), Georgia. Decommissioning services shall include dismantling, rigging, relocating the components to a designated on-base cutting site, reduction of major components to recyclable sizes, and hauling all resulting scrap and debris off Robins AFB. Upper Filler Piece: 64,000 lbs; Pressure Plate: 32,000 lbs; Lower Filler Piece: 86,000 lbs; Unwound Main Cylinder: 148,000 lbs; Plating attached to Lower Filler: 7,000 lbs (see Performance Work Statement for full details)
BidKar lists this notice to help you find it. Bids go to the buyer through the portal named above, never through BidKar. Check the original documents for the latest dates and conditions.