BidKar
5 days leftOpen to foreign firmsOn-site in the US

F16_Aircraft_Noun_Trailing_Edge_NSN_1560_01_725_3383_PN_202312284-20

Country
Buyer
DEPT OF DEFENSE / DEPT OF THE AIR FORCE
Closing
01 Dec 2026, 10:00 (Pakistan time)
Published
13 Mar 2025
Type of notice
Sources Sought
Category
Services
Reference
F16_Aircraft_Noun_Trailing_Edge_NSN_1560_01_725_3383_PN_202312284-20
Place of performance
Tinker AFB, OK
Source
Who can bid

Not set aside, but the work is performed in the US - realistic only with a US partner or presence. Needs SAM.gov registration.

Summary from the notice

1. JUSTIFICATION FOR ESTABLISHING A QUALIFICATION REQUIREMENT a. Criticality: Production of this Trailing Edge, Aircraft requires engineering source approval by the engineering support activity 416 SCMS/GUEAA in order to maintain the quality of the part. Failure to procure this Trailing Edge, Aircraft from a fully qualified source can result in structural or functional deficiencies that will degrade the mission capability of the F-16 Aircraft. b. Complexity, Manufacturing Processes, and/or Material Considerations: Inadequate control of characteristics associated with machining and processing of this Trailing Edge, Aircraft can result in product structural or durability degradation. Close tolerance matching of components is required. Special care and attention is required for surface finish, assembly, and sealing of this Trailing Edge, Aircraft to assure compliance with specified acceptance test requirements. c. Form, Fit, Function, and Interface: The qualification requirements specified herein are necessary to verify the structural and/or functional integrity and/or fit, form, and interface of the Trailing Edge, Aircraft being procured. 2. REASON WHY QUALIFICATION REQUIREMENT MUST BE DEMONSTRATED PRIOR TO ANY CONTRACT AWARD a. Completion of the specified pre-contract award qualification requirements are necessary to assure the government that the offeror is capable of producing the Trailing Edge, Aircraft in compliance with the applicable technical specification/data within the schedule and economic constraints of our contracts. There are significant technical and schedule risks which can only be minimized by a completion of the requirements prior to contract award. b. Qualification Requirement Cost Estimate: Estimated likely costs for testing and evaluation, which…

Open the original notice on SAM.gov

BidKar lists this notice to help you find it. Bids go to the buyer through the portal named above, never through BidKar. Check the original documents for the latest dates and conditions.