Tiger Pass Dredging Over Utility Corridor, Plaquemines Parish,
Not set aside, but the work is performed in the US - realistic only with a US partner or presence. Needs SAM.gov registration.
Summary from the notice
Description and Magnitude of Work is as follows: The work consists of the removal and satisfactory disposal of dredged material excavated from the Tiger Pass Bar Channel and identification of utilities, within the limits shown on the contract drawings. (The estimated time of completion is 135 calendar days after receipt of Notice to Proceed. The solicitation will include 5 drawings and specifications). No dike work is included with this project. The bid opening will be conducted virtually, please see Section 0010 for Instructions to Bidders.